工程投标及施工项目管理中应注意的几个问题

Several aspects in project bidding and construction item management
下载PDF
导出
摘要 将施工企业投标承包行为划分为 3个阶段 :投标前期阶段 (投标决策前阶段 )、投标报价阶段、项目实施阶段 (项目管理阶段 ) ,运用系统理论、组织经济、技术经济、成本管理、合同管理、工程施工索赔等理论方法 ,以成本管理为中心 ,市场需求约束为条件 (合同条件 )这条主线将 3个阶段中应注意的问题进行层层剥离 ,逐次分析 ,指出了施工企业经营目标是 :成本内敛、利润扩张、效益最大化。提出了施工企业 2 4字的经营策略是 :知已知彼 ,百战百胜 ;扬长避短 ,取胜之道 ;他山之石 ,可以攻玉。 Contract activities of construction enterprises by means of bidding are divided into three phases:pre-bidding phase (phase before bidding decision),bidding and price-quoting phase,project-executing phase (project-managing phase).Problems that should be paid attention to in the three phases are classified and analysed in detail by using theoretical economy,cost management,contract management,claim for construction of works,and taking cost management as a core,constraints of market demand as conditions (contract conditions).The managing objectives are pointed out,they are:gradually decreasing cost,expanding profit,maximizing benefit.The proposed strategy of management is:know the opponent and know yourself,make best use of the advantages and bypass the disadvantages;other people's good quality or suggestion whereby one can remedy one's own defects;and you can win a hundred victories.
作者 姜本鸿 熊瑛
出处 《人民长江》 北大核心 1999年第9期39-40,共2页 Yangtze River
关键词 工程投标 施工管理 工程费用 工程项目管理 Project bid Construction management Engineering cost Economic comparison Market economical system
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部