根据乌兹别克斯坦德赫卡拉巴德20万t/a钾肥厂生产调试情况,总结了钾肥厂设计中存在的问题,并提出了解决这些问题的优化方案和建议。
According to production commissioning condition of a 200 kt/a potash fertilizer plant in Uzbekstan,the problems presented in the potash fertilizer plant design was summarized,and the optimization programs and suggestions to resolve above-mentioned problems were put forward.