结合某客运专线现场实际现浇连续梁施工,对连续梁满堂支架的几道关键施工工序:地基处理、支架搭设、支架预压、支架验算进行了详细的介绍,对积累的相关施工经验进行了简要总结,以便共同促进提高满堂支架施工技术,更好的指导现场施工。
Combining with the cast-in-place continuous beam construction at field work of some passenger special line,the paper introduces some key construction processes,foundation treatment,the support erection,the support precompression and the support calculation for the continuous beam full space support,and sums up the relative experience,so as to enhance the full space support construction technique and direct the field construction better.
出处
《山西建筑》
2011年第13期103-104,共2页
Shanxi Architecture
关键词
满堂支架
地基处理
支架搭设
支架预压
支架验算
full space support
foundation treatment
support erection
support precompression
support calculation