7Wang T T, Lee C H. Life-cycle design considerations for hydraulic tunnels-lessons learned from inspection and maintenance cases[J]. Journal of Performance of Constructed Facilities, 2012 ( 5 ): 1-37.
8KC Lam, D Wang, PTK Lee, YT Tsang. Modelling risk allocation decision in construction contracts [J]. International Journal of Project Management, 2007,25 ( 5 ): 485--493.