摘要
根据新建太原南站旅客地道的施工特点及难点,采取了多项技术措施,详细介绍了地道施工的技术方案,并进行了分析、验算,以期确保支架设置满足受力要求,保证施工顺利进行。
According to the construction characteristics and difficulties of passenger tunnel of new-built Taiyuan southern railway station,it applies various technical measures,specifically introduces the technical scheme of tunnel construction,and carries on analysis and checking,with a view to ensure the support setting to meet the force requirements,and to guarantee the smooth construction.
出处
《山西建筑》
2011年第12期119-120,共2页
Shanxi Architecture
关键词
地道
施工方案
灰土挤密桩
支架
tunnel
construction scheme
lime-soil compaction pile
support