结合飞云江三桥主塔墩基础工程特点及施工重点,介绍了高性能混凝土配合比设计,分别对原材料选择,配合比参数等作了具体介绍,并通过抗氯离子渗透试验,确定了最终的施工配合比,为今后同类工程提供了指导。
Integrating with Feiyun river No.3 main tower pier foundation project features and construction focuses,it introduces the high performance concrete proportioning design,and describes raw material selection,and proportioning parameter and so on.Through resistance permeating of chloride test,it finally determines the construction mix proportion,which has provided guidance for future similar project.
出处
《山西建筑》
2011年第12期122-123,共2页
Shanxi Architecture
关键词
承台
高性能混凝土
耐久性
配合比
pile cap
high performance concrete
durability
mix proportion