摘要
结合工程建设各个阶段工作内容和特点,探讨了如何有效地控制工程造价,分别介绍了投资决策阶段、设计阶段、招投标阶段、施工阶段、竣工结算阶段的工程造价管理要点,以指导项目管理者有效控制造价,实现效益最大化。
Combining with the working contents and the features for all the stages for engineering construction,the paper explores the ways of how to have the effective control over the engineering costs,introduces the costs management points from the investment and decision-making stage,the design stage,the bidding stage,the construction stage,and the complete settlement stage,so as to direct the manager of the programs to have the effective control over the costs and realize the maximization of the benefits.