期刊文献+

三峡工程运用后武汉段河道冲淤变化研究 被引量:3

Erosion-Deposit Variation of the Channel in Wuhan Reach After the Operation of TGP
下载PDF
导出
摘要 三峡工程建成运用后,改变了水库下游河道的水沙条件,坝下游河道水流输沙能力处于不饱和状态,河道将发生沿程冲刷,并可能影响武汉河段的河势调整,进而可能对防洪产生一定影响。为此,在三峡大坝下游一维水沙数学模型最新计算成果基础上,采用数学模型计算与实测资料分析的手段进行了三峡工程建成后武汉河段水沙变化及河道冲淤演变研究。结果表明:三峡工程运用50年武汉河段河势没有发生大的变化,深泓线总体没有发生大的调整,白沙洲仍保持两汊过流的趋势,天兴洲左汊持续衰退,右汊发展。 The completion of the Three Gorges Project has changed the conditions of water and sediment in the downstream channel of the Three Gorges reservoir.Sediment transport capacity of the channel is in an unsaturated state.As a result,riverbed scouring will take place along the river channel,which may bring about adjustment of the Wuhan river regime and may further impact the flood control.In view of this,based on the latest research result of one-dimensional sediment mathematic model,the mathematic model computation along with the observed data analysis is used to conduct preliminary researches on the variation of sediment and the erosion-deposit evolution of the river channel in Wuhan river regime.The research result shows that after a 50-year operation of the Three Gorges Reservoir,there is little change of the river regime and the thalweg of the Wuhan reach.The two branches of Baisha sandbar are kept flowing.However,the left branch of Tianxing sandbar continues to decline,while with the right branch growing.
出处 《长江科学院院报》 CSCD 北大核心 2011年第4期80-86,共7页 Journal of Changjiang River Scientific Research Institute
基金 长江科学院院所基金项目-水沙变化与河流系统调整的多维复合模型研究(CKSF2010001) 国家自然科学基金(50879020) 水利部公益性行业专项经费项目(200901003)
关键词 三峡工程 武汉河段 冲淤 the Three Gorges project Wuhan reach erosion and deposit
  • 相关文献

参考文献3

二级参考文献15

共引文献82

同被引文献22

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部