结合在三峡库区实施的移土培肥工程,对工程实施中的各项关键环节进行了系统的总结,对取土区域的选择、土方平衡、土壤搭配和覆土等技术条件进行了详细阐述。
The key links of shifting soil and fertility betterment project of Three Gorges reservoir area were summarized systematically.The choice of the borrow area,earthwork balance,soil mix,soil sealing and other technical conditions were described in detail.
出处
《河北农业科学》
2011年第1期90-91,106,共3页
Journal of Hebei Agricultural Sciences
关键词
移土培肥
施工方式
三峡库区
Shifting soil and fertility betterment
Construction methods