4Barbara Ettorre.Reengineering Tales From the Front [J].Management Review.1994(7) :23-26.
5H.James Harrington.Perforrnance Improvement:The Rise and Fall of Reengineering [J].The TQM Magazine, 1998 (2) :41- 46.
6Kallio,J. ,Saarinen,T. ,Salo,S. ,Vepsa,M.Tinnila A.P.J. Drivers and Tracers of BPR [J]. Journal of Strategic Information Systems, 1999 (4) : 125-142.
7Grant,Delvin.A Using Existing Modeling Techniques for Manufacturing Process Reengineering:A Case Study [J].Computes in Industry,January, 1999(1 ) :301-311.