期刊文献+

蜀河水电站贯流机组泄流式厂房布置设计与研究 被引量:1

Design and research on arrangement of discharge type powerhouse for tubular units of Shuhe hydropower project
下载PDF
导出
摘要 蜀河水电站所处河谷地形狭窄、泄洪流量大、水头低,适合采用泄流式厂房布置。经过整体水工模型试验、厂房泄流表孔单体水工模型试验验证和厂房结构三维动力有限元计算分析研究,蜀河水电站采用贯流机组泄流式厂房布置技术合理、经济可行。 The valley where Shuhe hydropower project is located is narrow,with large flood discharge,low water head,so it is suitable to lay out the discharge type powerhouse.Through the integral hydraulic model test,rechecking by hydraulic model test on powerhouse single surface outlet,and 3D dynamic finite element analysis and calculation of powerhouse structure,it shows that the discharge type powerhouse arrangement adopted for tubular units of Shuhe hydropower project is reasonable in technology and feasible in economy.
作者 田利军
出处 《西北水电》 2011年第2期24-28,共5页 Northwest Hydropower
关键词 蜀河水电站 泄流式厂房 泄流表孔 枢纽布置 汛期泄洪 Shuhe hydropower project discharge type powerhouse surface outlet project structure arrangement flood discharge in flood season
  • 相关文献

参考文献2

二级参考文献2

  • 1DL/T5057-1996.水工混凝土结构设计规范[S].[S].,..
  • 2中国水电顾问集团西北勘测设计研究院.汉江蜀河水电站工程可行性研究报告[R],西安:西北勘测设计研究院,2005.07.

共引文献1

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部