期刊文献+

铁路大跨度钢管混凝土拱桥钢结构施工技术 被引量:4

CONSTRUCTION TECHNIQUE OF STEEL STRUCTURE FOR LONGSPAN STEEL PIPE CONCRETE ARCH RAILWAY BRIDGE
下载PDF
导出
摘要 论文分析了铁路大跨度钢管混凝土拱桥施工的特点和难点,提出了钢结构的施工方法和质量保证措施。 It is very difficult to construct large span steel pipe concrete arch railway bridge due to its complicated structure, no mature similar experience to follow and no relative regulation to be guided by. But it is possible to well construct these types of bridges through finding out their characteristics and key procedures, and adopting completed plant and eqiupment, proper construction technology and sequences and testing methods as follows: (1) Fully play the advantages of manufacture technical force and advanced equipment to ensure the accuracy of steel members and welding quality. Arrange the complicated procedures to be done in factory, so as to simplify assembling and welding works at site, thus improve the arched accuracy and welding quality. (2) Control the site welding deformation. It is mainly accomplished by adopting the proper technology and construction sequences together with firm supports and necessary site facilities. (3) Welding quality is mainly ensured through adopting proper welding technology and qualified welder with post certificate.
作者 黄武
出处 《铁道工程学报》 EI 1999年第3期34-38,共5页 Journal of Railway Engineering Society
关键词 施工 铁路桥 钢管混凝土拱桥 钢结构 railway steel pipe arch bridge construction
  • 相关文献

同被引文献16

引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部