摘要
目的总结放射科参与我医院PACS系统一期建设工作,为PACS系统二期建设提供经验。方法放射科全程参与医院PACS实施,包括提出需求、参与设计规划、协助实施、配合测试上线及功能验收等。结果经过充分的前期准备和实施,PACS系统在我院成功上线。结论医院PACS建设是一项全院性的工作,需要全力配合与协作,共同实现影像信息化管理。
Objective To discuss the work and experience of Radiology Department in construction of PACS.Methods The Department of Radiology participates in the whole processing of execution of PACS,including requirement analysis,designing and planning,cooperating testing and checking.Results Through sufficient preparing and execution,PACS put on line successfully in our hospital.Conclusion The construction of PACS is a whole-hospital task,with all our strength to realize the information management of radiology in hospital.
出处
《中国医疗设备》
2011年第4期36-39,共4页
China Medical Devices