摘要 随着海拔的升高,绝缘子放电电压随之下降,为了弥补绝缘子放电电压下降引起的线路绝缘水平下降,一般采取增大线路绝缘子爬距的措施,但是变电站和输变电设备的绝缘水平无法调整。针对此种情况,以木里500 kV GIS变电站及其500 kV出线为例,建立了基于ATP程序的仿真计算模型,同时根据DL/T620-1997提供的公式对绝缘子放电电压进行海拔校正,研究当输电线路调爬后,雷电侵入波在变电站电气设备上产生的过电压和过电流,并分析对变电站绝缘配合的影响。研究表明,当在1号杆塔绝缘子片数增至31片,其他各塔绝缘子片数增至40片,不会对该变电站绝缘配合构成威胁。 As the altitude increases,the discharge voltage of insulators declines.Generally,the measures of increasing the creepage distance are adopted to make up the decrease of line insulation level which results from the discharge voltage drop of insulators.However,the insulation level of substation and transmission and distribution equipment cannot be adjusted.So,taking 500 kV Muli GIS Substation and its transmission line for example,the simulation calculation model based on ATP is established,and the altitude correction for discharge voltage of insulators is carried out according to the formula in the DL/T 620-1997.The overvoltage and overcurrent generated in the electrical apparatus of the substation are calculated and the effect of lightning intruding surge on the insulation coordination of the substation is analyzed after adjusting the creepage distance.The research shows that there is no threat to insulation coordination if the number of insulators is added to 31 at No.1 tower and to 40 at other towers.
作者 冯千秀
机构地区 西南电力设计院
出处 《四川电力技术》 2011年第2期60-64,共5页 Sichuan Electric Power Technology
关键词 高海拔 线路调爬 雷电侵入波 绝缘配合 high elevation creepage distance adjustment lightning intruding surge insulation coordination
  • 相关文献

参考文献1

二级参考文献5

共引文献6

同被引文献1

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部