摘要
喀和线马牙克站在办理向S发车口延续进路时,原有的闭塞电路不能满足技术条件,发车进路锁闭、闭塞手续非正常自动办理影响了运输效率。本文对此进行分析,提出了切实可行的解决办法,在实际工程中取得了良好的效果。
The paper analyses the situation that the existing block circuit can not meet the technical requirements,and departure route locking and block procedure automatic handling affect the operational efficiency when handling the successive route for S-departure port at Ma Yake station of Kahe line,and suggests a feasible solution,which has achieved good results in the practical project.
出处
《电气化铁道》
2011年第2期35-36,共2页
Electric Railway
关键词
延续进路
闭塞电路
改进
successive route
block circuit
improvement