摘要
对湾则水电站施工过程中产生的水土流失进行了预测,并结合当地情况设计了水土保持方案。
This paper forecasts the water and soil erosion in the construction process of Wanze Hydropower Station,and connecting with the local conditions,designs the water and soil conservation scheme.
出处
《科技情报开发与经济》
2011年第8期210-212,共3页
Sci-Tech Information Development & Economy
关键词
湾则水电站
水土流失
水土保持
设计方案
Wanze Hydropower Station
water and soil erosion
water and soil conservation
scheme design