期刊文献+

合龙方案对大跨度连续梁桥线形控制的影响研究 被引量:2

Research on Influence of Different Girder Joint Schemes of Long-span Continuous Bridge's on Linear Control
下载PDF
导出
摘要 合龙方案是大跨度连续梁桥悬臂施工的关键步骤,工程后期合龙方案的变更将会对桥梁线形产生不良影响,借助有限元分析软件MIDAS分析方案变更对桥梁线形及合龙口高差的影响。 The girder joint schemes is the key step of continuous bridge construction.In engineering late,the changement of the girder joint schemes will have a negative impact on the bridge line.This article analysis and contrast vertical displacement and closure of the height difference which caused by originally girder joint schemes and changed girder joint schemes by applying the finite element analysis software M IDAS.
作者 吴晗明
出处 《建材世界》 2011年第2期87-89,共3页 The World of Building Materials
关键词 连续梁桥 合龙方案 有限元计算 线性控制 continuous bridge girder joint schemes finite element calculation linear control
  • 相关文献

参考文献3

  • 1杨涛,代迟书,冯涛华,等.合龙方案对大跨连续梁桥施工控制的影响研究[M].北京:人民交通出版社,2001.
  • 2范立础.桥梁工程[M].北京:人民交通出版社,2001..
  • 3徐晓龙.MIDAS用户培训手册[K].北京:北京迈达斯技术有限公司,2007.

共引文献502

同被引文献2

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部