摘要
九江分公司半再生重整装置因存在各种问题,装置一直处于低负荷运行状态。本文介绍了影响装置大负荷运行的各种瓶颈问题,并就有关问题进行了详细分析,以达到消灭瓶颈,提高处理量的目的。
Jiujiang branch's semi—regeneration reforming unit has been under low load operation condition because of the existence of various problems. This article describes various bottleneck problems,which have effects on the unit running under heavy load, and also makes a detailed analysis for the purpose of eliminating bottlenecks as well as improving treatment capacity.
出处
《石油与天然气化工》
CAS
CSCD
2011年第2期154-159,99,共6页
Chemical engineering of oil & gas