浅谈兰渝铁路隐蔽工程和关键部位作业实名制 被引量:3

Discussion on the Registration & Confirmation System for Hidden Works and Key Parts on Lanzhou-Chongqing Railway
下载PDF
导出
摘要 兰渝铁路创新地实施了隐蔽工程和关键部位作业实名制管理,即在施工中对隐蔽工程和关键部位的作业进行实名登记,施工、技术、质检负责人签认证明,施工中随时组卷归档,验交时移交运营单位,作为工程质量安全终身负责的经济、行政和法律责任追究依据。文章概括介绍了兰渝铁路工程实名制管理的主要内容及其重要性。 The registration confirmation system has been executed for the hidden works and key parts on Lanzhou-Chongqing railway.The system suggests that the operation registration of the hidden and key parts to be done by real names;persons in charge of construction,technique and quality inspection must sign for recognition;documents should be filed at proper time and transferred to the operatoration units after acceptance to serve as the basis of economic,administrative and legal liabilities regarding construction quality and safety.The main contents and significance of registration confirmation system management of Lanzhou-Chongqing railway are presented in the paper.
作者 王庆林
出处 《现代隧道技术》 EI 北大核心 2011年第2期5-6,共2页 Modern Tunnelling Technology
关键词 兰渝铁路 隐蔽工程 关键部位 实名制 Lanzhou-Chongqing railway Hidden works Key part Registration & confirmation system
  • 相关文献

同被引文献20

引证文献3

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部