木寨岭隧道高地应力软岩大变形施工技术 被引量:51

Construction Techniques of Muzhailing Tunnel with High Ground Stresses and Large Soft Rock Deformations
下载PDF
导出
摘要 木寨岭隧道施工中受到高地应力软岩地质的影响,初期支护多处出现大变形,破坏严重。为了保证顺利安全施工,采用了先柔后刚、先放后抗、多重支护、预留变形量、应力释放、提高二次衬砌刚度和超短台阶开挖等措施,有效控制了围岩大变形。文章主要介绍了木寨岭隧道的工程概况、施工中出现的大变形情况,以及控制大变形的各项措施和效果检验。 During the construction of Muzhailing tunnel,high ground stresses of soft rocks caused large deformations and damages of primary support.In order to guarantee smooth and safe construction,measures such as multiple support,deformation allowances,stress releasing,stiffness increasing of secondary lining and super-short step excavation were adopted which effectively controlled the large deformation of surrounding rocks.This paper introduces the project in general,large deformations during construction and countermeasures as well as their effect inspection in Muzhailing tunnel.
出处 《现代隧道技术》 EI 北大核心 2011年第2期78-82,共5页 Modern Tunnelling Technology
关键词 高地应力 软岩 大变形 控制措施 High ground stress Soft rock Large deformation Control measures
  • 相关文献

参考文献6

二级参考文献40

共引文献117

同被引文献546

引证文献51

二级引证文献291

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部