摘要
针对灌注桩后压浆技术,结合工程实例,并根据在施工中的关键环节,提出监理控制桩质量的事前、事中、事后的控制手段,详细阐述了灌注桩施工质量监理控制的特点及过程,以使灌注桩质量达到预期的质量控制目标。
Based on the key point of bored pile with post grouting technique during the real project construction, the measures of beforehand, current and afterward control for pile quality was proposed. The features and process of bored pile quality supervision and control was introduced, so that to satisfied with the expected aim of bored pile quality.