摘要
结合陕西潼西高速公路改扩建项目K92+621大桥(跨越陇海线)工程实例,探讨了连续梁桥施工监测的方法,并就施工阶段的实测值与计算值进行了对比分析,得出一些有指导意义的结论。
Combining with K92+621 Bridge(over Lianyungang-Lanzhou railway),in the reconstruction program of Tong-Xi expressway in Shannxi,the paper explores the methods for the supervision of the continuous beam bridge construction,compares and analyzes the observation value and the calculation value in the construction stage,and concludes some directive results.
出处
《山西建筑》
2011年第14期153-155,共3页
Shanxi Architecture
关键词
施工监测
挂篮
跨越铁路线
construction supervision
hanging basket
over railway