摘要
结合裕溪闸枢纽工程实际情况,探讨了堤防工程施工进度保证措施,结合该工程特点,介绍了项目部各职能部门的设置及其主要任务,着重阐述了施工测量工作内容及控制措施,并提出了指导性建议。
Combining with the hub projects of Yuxi brake,the paper explores the speed ensuring measures for the embankment,introduces the allocation and main tasks of the functional departments of the program department by combining with the features of the project,and illustrates the work contents and the controlling measures of the construction,and points out some directive suggestions.
出处
《山西建筑》
2011年第14期207-208,共2页
Shanxi Architecture
关键词
堤防工程
施工进度
施工测量
embankment project
construction speed
construction measurement