摘要
概述了白城地区既有概况,根据存在的主要问题及车流特点,结合长白线引入主要研究了三类方案,分别为白城站客货横列方案、白城客货纵列方案、白城西长白乌直通方案。并依次分析其中各方案的优缺点,提出推荐采用白城站客货横列白乌线沿既有线增二线方案。
The paper explains the general conditions of Baicheng Area,and based on the main problems and traffic characteristics and introduction of Changbai Line,studies three programs,which are respectively Baicheng passenger and freight row program,Baicheng passenger and freight column program and direct West Baicheng-to-Changbaiwu program.Then it analyzes their advantages and disadvantages and recommends the first program with the existing line.
出处
《山西科技》
2011年第2期31-32,共2页
Shanxi Science and Technology
关键词
白城地区
客货横列
引入方案
Baicheng Area
passenger and freight row
introduction program