白俄罗斯明斯克5号热电站一期改建工程,采用液压提升装置和吊装架配套使用的吊装工艺进行燃汽轮机的吊装和就位施工,降低了施工的安全风险和安装误差,减少了施工工期并节约施工成本。通过实践,对于国外吊装工程施工注意事项进行了分析和总结。
Belarus Minsk No.5 thermal power plant’s f irst phase of rebuilding project,adopt the hoisting process that hydraulic ascending device supporting the use of hoisting frame for the hoisting and taking its position of gas turbine,reduce the construction security risk and installation errors,reduce the construction period and construction costs.Through the practice,analyzed and summarized the hoisting construction precautions in foreign.