摘要 输电杆塔部件的力学性能试验对输电线路杆塔的设计和发展起着十分重要的作用。介绍我国唯一的输电杆塔部件试验室液压加荷系统,研究该系统的试验能力、加荷系统的组成和电气控制系统的设计,归纳总结了系统的主要特点。应用结果表明,该系统各项指标均较好地满足了输电杆塔部件试验的测试需求。 Strength test of transmission tower component is very important for design and development of transmission power.The hydraulic pressure system of the only transmission tower component testing lab in china was introduced.The test ability,system composition and design of the electric control system were investigated.Main characteristics of the hydraulic pressure system were concluded.The application results show that capability of the system can meet testing requirements of tower component test excellently.
出处 《机床与液压》 北大核心 2011年第7期82-85,共4页 Machine Tool & Hydraulics
关键词 输电杆塔 部件试验 液压加荷系统 测控系统 Transmission tower Component test Hydraulic pressure system Measure and control system
  • 相关文献

参考文献2

  • 1马永欣,郑山锁.结构试验[M].北京:科学出版社,2006.
  • 2张新房,邢海军,周立民.特高压杆塔试验基地部件试验室试验系统调试报告[R].北京:中国电力科学研究院,2009.

共引文献1

同被引文献5

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部