8RUAN Xin, SHI Xuefei, LI Xiaoxiang. Failure analysis of tendon breakout on bottom slab of a pre-stressed con- crete box gird bridge during construction [ J 1. Engineering Failure Analysis, 2012, 25 (10) :291-303.
9MOON Doyoung, SIM Jongsun, OH Hongseob. Practical crack control during the construction of precast segmental box girder bridges[ J 1. Computers and Structures, 2005, 83 ( 12 ) : 2584 -2593.
10HELDER Sousa, JOAO Bento, JOAQUIM Figueiras. Construction assessment and long-term prediction of pres- tressed concrete bridges based on monitoring data J ]. Engineering Structures, 2013, 52 ( 6 ) : 26-37.