期刊文献+

对水电工程征地移民设计管理中几个新理念的探讨 被引量:13

Discussion on the New Ideas for Resettlement Design and Management of Hydropower Projects
下载PDF
导出
摘要 在经济社会大发展的背景下,水电工程建设征地的移民安置规划设计管理迫切需要各有关方面针对新理念、新现象,积极探索新途径、开创新局面、解决新问题,做好新时期水电工程移民设计管理工作。通过几个工程移民安置的调研,对引入质量差系数参与移民生产安置人口计算、移民安置逐年支付分配方式、"先移民后建设"、移民工程项目代建制、发挥主体设计单位作用等新理念进行了归纳、分析和探讨。这些新的理念和方法在实际工作中是有一定成效的。 Some new ideas for resettlement planning, design and management of hydropower projects have emerged under current economic and social development in China. The new ideas of Introducing quality factor in the calculation of resettlement compensation, Paying the compensation on an annual basis, Initiating Construction after Finishing Resettlement, Adopting construction agent system and Playing the role of main project design department in resettlement design are analyzed herein. The investigations show that these ideas have certain effectives in actual resettlement planning, design and management.
出处 《水力发电》 北大核心 2011年第4期9-12,共4页 Water Power
关键词 征地移民 新理念 水电工程 resettlement new ideas hydropower project
  • 相关文献

参考文献5

  • 1DL5064-2007水电工程建设征地移民安置规划设计规范[S].
  • 2发展改革委等有关部门负责人答记者问.国务院关于完善大中型水库移民后期扶持政策的意见:让水库移民共享改革发展成果促进库区和移民安置区经济社会可持续发展[EB/OL].http://www.sdpe.gov.en/xwfb/t20060814-80053.htm,2006-08-14.
  • 3水电水利规划设计总院.水电建设促进地方经济社会发展政策研究报告[R].北京:水电水利规划设计总院,2008.
  • 4全国注册咨询工程师(投资)资格考试参考教材编写委员会.工程项目组织与管理[M] ,北京:中国计划出版社.2007.12.
  • 5彭幼平,蔡频,李环宇.水电工程农村移民非农业安置方式的探讨[J].水力发电,2007,33(3):20-21. 被引量:9

二级参考文献2

共引文献14

同被引文献44

引证文献13

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部