摘要
在经济社会大发展的背景下,水电工程建设征地的移民安置规划设计管理迫切需要各有关方面针对新理念、新现象,积极探索新途径、开创新局面、解决新问题,做好新时期水电工程移民设计管理工作。通过几个工程移民安置的调研,对引入质量差系数参与移民生产安置人口计算、移民安置逐年支付分配方式、"先移民后建设"、移民工程项目代建制、发挥主体设计单位作用等新理念进行了归纳、分析和探讨。这些新的理念和方法在实际工作中是有一定成效的。
Some new ideas for resettlement planning, design and management of hydropower projects have emerged under current economic and social development in China. The new ideas of Introducing quality factor in the calculation of resettlement compensation, Paying the compensation on an annual basis, Initiating Construction after Finishing Resettlement, Adopting construction agent system and Playing the role of main project design department in resettlement design are analyzed herein. The investigations show that these ideas have certain effectives in actual resettlement planning, design and management.
出处
《水力发电》
北大核心
2011年第4期9-12,共4页
Water Power
关键词
征地移民
新理念
水电工程
resettlement
new ideas
hydropower project