摘要
对JB/T 4710—2005关于计算方面的主要修改内容,以及SW6软件塔器模块中根据工程设计实际需要而新增的计算内容进行讨论。
The main modification in calculation aspect in JIM710 was introduced. At the same times, the appended calculations in SW6, which is necessary in practical engineering, were discussed.
出处
《化工设备与管道》
CAS
2011年第2期9-10,21,共3页
Process Equipment & Piping
关键词
地脚螺栓
多个压力腔的塔器
裙座与筒体的连接段
anchor bolt
column with multi chambers
transition segment between cylinder and skirt