梯级水电站经济运行评估新方法研究与应用 被引量:15

A new approach to assess the power-generating management for cascade hydropower plants
原文传递
导出
摘要 现行水电站经济运行考核评估方法根据实际来水以及初步设计和调度图(对于无调节能力电站则根据考核水位)计算考核电量,核心概念是节水增发电量。本文提出以优化挖潜为目的的新考核评估思路,提出基于"理论最大发电量(效益)"的"发电完成率"概念,采用精细模拟与优化调度耦合模型初步建立了新的评估方法。以三峡-葛洲坝梯级水电站经济运行的评估为例,对比分析了两种方法的特点。 The existing assessment method of economic operation of hydropower plant based on initial design and operation chart emphasizes an conception of increasing power output by using the water saved.In this paper,a new assessment method of accurate simulation and operation optimization is presented.In this method,a theoretical maximum output is obtained first,and then the ratio of actual output over this maximum and some other factors are used to estimate the operation level.A case study of the Three Gorges-Gezhouba cascade hydropower plants shows advantages of the new method.
出处 《水力发电学报》 EI CSCD 北大核心 2011年第2期15-19,共5页 Journal of Hydroelectric Engineering
基金 国家"十一五"科技支撑计划"特大型梯级水利水电工程安全及高效运行若干关键技术研究"重点项目(20073338900)第九课题(2008BAB29B09)"三峡-葛洲坝梯级水利枢纽调度技术集成及示范"
关键词 三峡 葛洲坝 梯级水电站 经济运行 评估 Three Gorges project Gezhouba dam cascade hydropower plants economic operation assessment
  • 相关文献

参考文献6

二级参考文献17

共引文献68

同被引文献114

引证文献15

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部