摘要
全面介绍了高速铁路900 t简支箱梁建造的成套技术与装备,包括900 t简支箱梁的预制技术和装备、运输技术和装备、架设技术和装备及特殊工况下900 t简支箱梁建造技术及装备,可供从事高速铁路和桥梁工程技术人员参考。
Complete set technologies and equipment for 900 t simple supported box beam construction in high speed railways are introduced in this paper,including the pre-fabrication technologies and equipment of the 900 t simple supported box beams,transport technologies and equipment,laying and erection technologies and equipment,construction technologies and equipment of the 900 t simple supported box beams under special working conditions,which can be reference to technicians in high-speed railway and bridge engineering.
出处
《中国工程科学》
2011年第4期75-80,共6页
Strategic Study of CAE
关键词
高速铁路
简支箱梁
建造技术
high-speed railway
simple-supported box beam
construction technology