期刊文献+

基于蒙特卡洛仿真的设备维修周期建模与优化 被引量:5

Maintenance Modeling and Optimization of Equipment Based on Monte Carlo Simulation
下载PDF
导出
摘要 针对具有三级维修机构保障的复杂设备,通过对设备使用维修流程分析,给出了设备整个使用寿命期内的使用与维修状态转移图,建立了设备整个使用寿命期内的维修周期与平均可用度关系模型。并应用蒙特卡洛仿真方法,结合算例分析得到了使平均可用度达到最大的最佳维修周期,说明了模型的适用性与灵敏性,可为设备维修决策提供依据。 Targeting at the complex equipment guaranteed by three-levels maintenance institution,it presented a switching chart of equipment application and maintenance condition transformation in a lifecycle by analyzing equipment application and maintenance flowing procedure.It also established the connection model between maintenance cycle and average availability in a lifecycle.Through appling Monte Carlo simulation method and analyzing an application case,the optimal maintenance cycle that can ensure the average availability is maximal was received,in which the applicability and sensitivity of the model are proved.This approach can be used for maintenance decision-making.
机构地区 军械工程学院 [
出处 《计算机与数字工程》 2011年第4期47-49,82,共4页 Computer & Digital Engineering
关键词 复杂设备 可用度 维修周期 蒙特卡洛仿真 模型 complex equipment availability maintenance cycle Monte Carlo simulation model
  • 相关文献

参考文献5

  • 1Na Liu, Gaoweng Sheng, Kexiong Tan. Decision on Maintenance Period for Power Transformer based on Monte Carlo Simulation Reliability[C]//Proceedings of the 7th Internatiomal Conference on Properties and Ap- plications of Dielectric ]Materials. June, 1-5,2003, Nogo- ya: 479-482.
  • 2C. Richard Cassady, Ilyas Mohammed Iyoop. A Ge- neric Model of Equipment Availability Under Imperfect Maintenance[J]. IEEE TRANSACTION ON RELIA- BILITY, 2005,54(4):564-571.
  • 3Hairong Sun, Jame J. Han. The Failure of MTTF in Availability Evaluation [J]. IEEE 2002 PROCEEDINGS Annual RELIABILITY and MAINTAINABILITY Symposium,2002:279-284.
  • 4韩东,李石磊.基于可用度的电子装备预防维修周期研究[J].军械工程学院学报,2008,20(5):12-14. 被引量:6
  • 5甘茂治,康建设,高崎.军用装备维修工程学[M].第二版.北京:国防工业出版社,2005.

共引文献10

同被引文献27

引证文献5

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部