虎门大桥墩、塔、锚GPS施工测量

GPS Construction Survey of the Piles, Towers and Anchorages of Humen Bridge
下载PDF
导出
摘要 介绍在工程全长15 .6 km 、主桥长4 .58 km 的虎门大桥建设中,利用GPS定位技术进行桥梁的施工放样。实践证明,GPS定位技术确定的悬索桥索塔、锚锭、连续刚构桥主墩和西岸引桥高墩的平面和高程点位误差和相对点位误差均满足桥梁施工规范要求。同时也说明在沿海平坦地区。 Humen bridge has a total length of 15.6 km and a main bridge length 4.58 km. In this paper, the construction survey of Humen bridge conducted by GPS positioning technique is introduced. Practice proves that the layout precisions of the cable support towers and anchorages of the suspension bridge, the main piers of the continuous rigid frame bridge, and the piers of the west approach bridge are fulfilled to the bridge construction specifications. It also shows that GPS datum transformation by using 'construction ellipsoid' in coastal plains can obtain satisfactory applicable results for bridge construction survey.
出处 《西南交通大学学报》 EI CSCD 北大核心 1999年第5期560-564,共5页 Journal of Southwest Jiaotong University
基金 广东省交通厅九五年度科技项目
关键词 桥梁 施工测量 桥塔 GPS 桥墩 锚锭 GPS bridge construction survey
  • 相关文献

参考文献4

  • 1朱华统.常用大地坐标系及其变换[M].解放军出版社,1990..
  • 2岑敏仪,瞿国万,刘成龙,卓健成,路伯祥,林荣有.GPS桥梁高程控制测量[J].测绘学报,1998,27(3):217-223. 被引量:22
  • 3岑敏仪,测绘学报,1998年,27卷,217页
  • 4朱华统,常用大地坐标系及其变换,1990年,77页

二级参考文献4

共引文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部