摘要
北京燕化石油化工股份有限公司化工一厂高密度聚乙烯装置扩容改造项目是该公司1998年安排的10个效益增长点之一。本文介绍了该项目的背景和工作开展情况,包括装置瓶颈分析、设备核算、改造内容的确定、相关的技术工作等,评述了改造的经验和效果。
Revamping and expanding HDPE plant of Chemical Works No.1 was one of the ten benefit - increasing projects arranged by Beijing Yanhua Petrochemical Company in 1998. The background and progress of the project was introduced in this article, including the analysis of bottleneck in the plant, equipments accounting, determination of the revamping content and the related technical issues. A comment was made on the experiences and achievements acquired.
出处
《合成树脂及塑料》
CAS
1999年第6期24-28,共5页
China Synthetic Resin and Plastics