摘要
雷绿银.DDL┐Ⅲ生产测井系统的操作故障及排除方法.测井技术,1999,23(3):234~238DDL-Ⅲ生产测井系统在我国大多数油田都已投产10年左右,在作业中DDL-Ⅲ生产测井系统中的盒式磁带机、HP-150终端机、仪器输入输出控制器TIOC、实时显示器RTD、开关矩阵、井下仪器供电电源、深度系统、张力计系统以及组合仪等易出现故障,文中对故障原因进行了详细的分析。
Abstract Since DDL production logging system has been put into
operation for more than ten years in most of China oil fields, problems are liable to occur
in cassette tape unit(CTU), HP150 terminal, I/O controller (TIOC), realtime display, matrix
switch, dual power supply, depth system, tension system and combination tools. The
causes of the troubles are detailed, their solutions are given. Subject Terms: (production
loggingfailure analysislogging equipment
出处
《测井技术》
CAS
CSCD
北大核心
1999年第3期234-238,共5页
Well Logging Technology