摘要
通过运用灌砂法对乐昌峡水利枢纽工程右岸单车道应急专项工程水稳层进行压实度检测,分析比较统计检测数据,得出水稳层含水率对干密度的相关关系,并提出水稳层的检测时间对干密度存在影响,提请有条件的科研机构进行相关的研究探讨。
To make a compactness detection for the cement stabilized base of the single lane in the right bank of emergency special project in Lechang gorge water conservancy hub project by sand replacement method,to work out the correlation between the moisture content of cement stabilized base and dry density by statistical analysis on the detected data,and point out the detected time have influence on the dry density of cement stabilized base.Submit the useful information to the research institutes for further research.
出处
《西部探矿工程》
CAS
2011年第5期1-2,5,共3页
West-China Exploration Engineering
关键词
水稳层
含水率
干密度
回归分析
cement stabilized base
moisture content
dry density
regression analysis