期刊文献+

岩溶隧道勘察阶段涌水量计算方法探讨 被引量:1

Discussion on Calculation of the Prediction of the Discharge Rate of Karst Tunnel Gushing in Investigation Stage
下载PDF
导出
摘要 勘察阶段岩溶隧道涌水量的预测是隧道涌水量预测工作难点中的难点。从当今岩溶隧道涌水研究的现状出发,找出勘察阶段岩溶隧道涌水量预测存在的问题,并分析其原因,通过总结以往工程实例,得出一提高岩溶隧道在勘察阶段预测涌水量精度的方法,并辅以实例阐述。 The prediction of the discharge rate of karst tunnel gushing in investigation stage is the most difficult problem in the prediction of the discharge rate of tunnel gushing.The paper starts from the research state about karst tunnel gushing,in recent years,then,finds out some problems in the prediction of the discharge rate of karst tunnel gushing in investigation stage,and analyses their causations.Finally,summarizing some engineering examples,aquires a mathed for improving the pricision of the prediction of the discharge rate of karst tunnel +gushing in investigation stage.In order to explain it,the paper picks up an example specially.
出处 《西部探矿工程》 CAS 2011年第5期181-184,共4页 West-China Exploration Engineering
基金 河海大学科技创新基金资助项目(2084/40401115)
关键词 工程勘察 岩溶隧道涌水量预测 涌水量计算方法 engineering investigation the prediction of the discharge rate of karst tunnel gushing calculation method of discharge rate
  • 相关文献

参考文献12

二级参考文献73

共引文献512

同被引文献6

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部