摘要
我公司在新油库区球罐项目建设中,基础采用锤击沉管灌注桩,为确保工程质量,制定一系列监控措施,并取得较好的效果。
In the construction of the Sphere Project in the new oil depot area, our corporation adopted the technique of hammer tube pour stake for sphere basis and a series of supervising & cibtrolling measures for ensuring the engineering quality, and thusobtained a good result.
出处
《福建建筑》
1999年第3期48-49,共2页
Fujian Architecture & Construction