大洼三角洲平原水库土坝护坡工程采用机织模袭混凝土新技术。质量表明,机织模袋混凝土施工技术满足设计要求,工程质量达到了标准。
The earth dam revetment on Dawa delta plain reservoir adopts machine knitting membrane bagconcrete technology. Quality check measurement indicates that the machine knitting membrane bag concreteconstruction meets design demand and the project quality reaches standard.
出处
《东北水利水电》
1999年第7期39-40,共2页
Water Resources & Hydropower of Northeast China
关键词
护坡
混凝土
质量控制
机织模袋
检测