摘要
吸收塔内浆液系统因防腐层脱落和浆液品质控制不当引发堵塞,文章论述了堵塞形成的原因,并提出了具体的处理措施,处理后收到良好效果。
The slurry system inside the absorbing tower was blocked due to the anticorrosion layer being dropped and the improper quality control of slurry.The paper expounded the formation of the blockage and put forward the concrete treatment measures.A good result has been achieved.
出处
《湖北电力》
2011年第2期24-25,共2页
Hubei Electric Power
关键词
吸收塔
浆液系统
堵塞
absorbing tower
slurry system
blocking