摘要 介绍了三峡左岸电站机组启动补气及微正压供气系统在运行中出现的问题及解决措施。经实践证明,该措施有效解决了启动补气及微正压供气系统排气温度过高导致停机的问题,并已在右岸电站机组补气微正压系统中推广应用。 Introduced the problem arising in operation of starting up unit gas supplement and micro positive pressure gas supply system of three gorges left bank power station and its resolving measures.Field practice testified that by these measures can effectively solve the problem of over high temperature of exhaust of starting up gas supplement and micro positive pressure gas supply system which leading to unit shut down,these measures have been put into use in right bank power station unit gas supplement and micro positive pressure system
作者 袁希莉
出处 《华中电力》 2011年第2期56-58,共3页 Central China Electric Power
关键词 电站机组补气及微正压系统 运行分析 解决措施 substation unit gas supplement and micro positive pressure system operation analysis resolving measures
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部