摘要
针对白山抽水蓄能泵站工程施工条件复杂,对该工程的导流标准、围堰形式、进度安排及施工方法等方面的特点进行了分析论述。
The paper analyses character concerning diversion standard, cofferdam type, schedule, construction method in view of the complex construction condition of Paishan pumped storage power pamp station.
出处
《东北水利水电》
1999年第8期18-19,共2页
Water Resources & Hydropower of Northeast China
关键词
抽水蓄能泵站
施工导流
导流标准
围堰
Baishan pumped storage power pump station construction diversion diversion standard cofferdam