期刊文献+

卸载浮标系统运动响应分析 被引量:1

Motion response analysis of moored offloading buoy
下载PDF
导出
摘要 深水卸载浮标系统具有相对较小的排水量和惯性,其系泊缆索的质量、阻尼和刚度会对卸载浮标系统产生非常大的影响,因而对浮标和其系泊系统进行准确的耦合动力响应分析十分重要。应用边界元方法计算浮标的水动力,通过快速傅立叶变换,将频域计算结果变换到时域;基于全量的拉格朗日表述和两节点的等参索单元,应用几何非线性有限元方法和Newmark方法计算了系泊缆索张力;最后应用四阶龙哥库塔法计算浮标及其系泊缆索的时域耦合运动方程,得到浮标运动响应和缆索张力。 The deepwater offloading buoy system has relatively small displacement and inertia,so that the mass,damping,and stiffness of the mooring lines have a great impact on the buoy's dynamic response,thus the accurate coupled analysis of the dynamic response on buoy and its mooring system is particularly important.Applying the boundary element method to calculate hydrodynamic forces of buoy,results in frequency domain can be transformed into the time domain by fast Fourier transform.Based on the total Lagrange formulation and the two-node isoparametric cable element,this paper applies the geometric nonlinear finite element method and Newmark method to calculate tensions in mooring lines.Forth order Runge-Kutta integration scheme is applied to calculate coupled motion equations of buoy and mooring lines in time domain,then the motion response of buoy and tensions in mooring lines can be obtained.
出处 《水运工程》 北大核心 2011年第4期40-44,共5页 Port & Waterway Engineering
基金 国家863项目资助(2007AA11Z130) 国家创新研究群体科学基金(50921001)
关键词 浮标 系泊缆索 边界元 非线性有限元 耦合 buoy mooring cable boundary element nonlinear finite element couple
  • 相关文献

参考文献17

  • 1Bunnik T H J, de Boer G, Cozijn J L. Coupled mooring analysis in large scale model tests on a deepwater calm buoy in mild wave conditions[C]. OMAE 2002-28056.
  • 2Cozijn J L, Bunnik T H J. Coupled mooring analysis for a deep water calm buoy[C]. OMAE 2004-51370.
  • 3Cozijn H, Uittenbogaard R, ter Brake E. Heave, Roll and pitch damping of a deepwater calm buoy with a skirt [C]. ISOPE 2005.
  • 4Berhauh C, Guerin P, Le Buhan P, et al. Investigations on hydrodynamic and mechanical coupling effects for deep-water offloading buoy[C]. ISOPE 2004.
  • 5Ryu S, Duggal A S, Heyl C N, et al. Coupled analysis of deepwater oil offloading buoy and experimental verification[C]. ISOPE 2005.
  • 6Ryu S, Duggal A S, Heyl C N, et al. Prediction of deepwater oil offloading buoy response and experimental validation[J]. International Journal of Offshore and Polar Engineering,2006, 16(4): 290-296.
  • 7Le Cunff C, Ryu S, Duggal A, et al. Derivation of calm buoy coupled motion raos in frequency domain and experimental Validation[C]. ISOPE 2007.
  • 8Salem A G, Ryu S, Duggal A S, et al. Linearization of quadratic drag to estimate calm buoy pitch motion in frequency-domain and experimental validation [C]. OMAE 2009.
  • 9董树江.浮标和锚系.水运工程,1979,(6):23-26.
  • 10俞聿修.浮筒多链系统的静力特性[J].大连工学院学报,1981,(1):151-160.

二级参考文献13

  • 1卢德明,潘斌,叶平.移动式平台稳性计算方法[J].海洋工程,1993,11(4):7-12. 被引量:7
  • 2梁文娟,陈高增.船舶碰撞力和能量吸收[J].交通部上海船舶运输科学研究所学报,1992,15(2):23-35. 被引量:21
  • 3张海文.大型船舶浮筒系泊断缆事故分析[J].交通部上海船舶运输科学研究所学报,1992,15(2):45-53. 被引量:4
  • 4赵晖平.HF(B)2400玻璃钢浮标的研制[J].中国河运,1994(9):31-32. 被引量:1
  • 5张相木 李维扬.单点系泊系统在风、浪、流联合作用下的运动和系泊荷载[J].海洋工程,1988,6(4):17-27.
  • 6王晓明.防风水鼓系泊系统动力计算[D].北京:清华大学水利水电工程系,2001.
  • 7Brown D. T., Mavrakos S. Comparative study on mooting line dynamic loading [J].Marine Structure, 1999, 12(3) :131 - 151.
  • 8Ramzan, F. A,, Robison, R, w. An engineering assessment of the validity of the quasi - static approach to semisub-mersible mooring design [A], Proc of the 18th offshore Tech Conf[C], Dallas Texas: 1986,419 - 425.
  • 9Wang H T,Report of DTNSRDC,1977年
  • 10H.O.贝托著 蒋割荆译.浮标工程(M)[M].北京:人民交通出版社,1980..

共引文献73

同被引文献7

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部