连云港港25万吨级矿石接卸码头工程总体设计

General Layout of 250000 Tons Ore Discharge Terminal Project in Lianyungang Port
下载PDF
导出
摘要 连云港港25万吨级矿石接卸码头工程是我国目前一次性建设规模最大的矿石码头,是连云港港旗台作业区建设的第一座码头,因此其码头的布置形式、码头前沿线位置、码头面高程和陆域高程的确定尤为重要。文中从总体布置、平面布置等方面论述了该工程的总体设计思路。工程建成后运转正常,为旗台作业区后续工程的建设奠定了基础,提高了我国大型专业化散货码头的工艺水平。 250 000 Tons ore discharge terminal project of Lianyungang Port is the largest ore terminal for one-time construction in China at present,and is the first terminal of Qitai work area in Lianyungang Port,so it is important to determine the general arrangement of terminal,the front line location,the terminal top elevation,and the land area elevation.This paper discusses the overall design thought from the aspects of general layout,plane layout and etc.The project was well running after it completed,laid the foundation for the following works in Qitai work area,and improved the technological level of large-scale specialized bulk cargo wharf in China.
作者 兰加智
出处 《中国港湾建设》 北大核心 2011年第2期17-20,共4页 China Harbour Engineering
关键词 矿石码头 总体设计 港口工程 ore terminal overall design port engineering
  • 相关文献

参考文献3

  • 1连云港港旗台港区25万吨级矿石接卸码头工程初步设计[R].上海:中交第三航务工程勘察设计院有限公司,2008.
  • 2连云港港总体规划[R].北京:交通部规划研究院,2007.
  • 3连云港港15万吨级航道扩建工程初步设计[R].上海:中交上海航道勘察设计研究院有限公司,2006.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部