摘要
连云港港25万吨级矿石接卸码头工程是我国目前一次性建设规模最大的矿石码头,是连云港港旗台作业区建设的第一座码头,因此其码头的布置形式、码头前沿线位置、码头面高程和陆域高程的确定尤为重要。文中从总体布置、平面布置等方面论述了该工程的总体设计思路。工程建成后运转正常,为旗台作业区后续工程的建设奠定了基础,提高了我国大型专业化散货码头的工艺水平。
250 000 Tons ore discharge terminal project of Lianyungang Port is the largest ore terminal for one-time construction in China at present,and is the first terminal of Qitai work area in Lianyungang Port,so it is important to determine the general arrangement of terminal,the front line location,the terminal top elevation,and the land area elevation.This paper discusses the overall design thought from the aspects of general layout,plane layout and etc.The project was well running after it completed,laid the foundation for the following works in Qitai work area,and improved the technological level of large-scale specialized bulk cargo wharf in China.
出处
《中国港湾建设》
北大核心
2011年第2期17-20,共4页
China Harbour Engineering
关键词
矿石码头
总体设计
港口工程
ore terminal
overall design
port engineering