摘要
详细地介绍了龙涤集团8 万t 聚酯装置,在不对仪表、设备进行改造的前提下,经工艺参数的精调实现聚酯装置增容的过程。为同类装置的增容提供了宝贵的经验。
To introduce in detail the process of capacity increase of 80 kt/a PET unit of Longdi Group.This was realized by means of optimizing the process parameters without modifing any instrument and equipment.This result offers valuable experience about capacity increase to the same type of unit.
出处
《聚酯工业》
CAS
1999年第3期34-38,共5页
Polyester Industry
关键词
聚酯装置
增容
工艺精调
聚酯纤维
polyester unit
capacity increase
process opitimization