三峡水电站左岸厂房水轮机蜗壳保温保压后运行监测成果分析 被引量:4

Monitoring Result after Keeping the Pressure and Temperature in Spiral Case of Left Bank House,Three Gorges Hydropower Station
原文传递
导出
摘要 对三峡水电站左岸厂房蜗壳在充水保温保压进行外包二期混凝土浇筑后,设计低水头运行的情况下的监测资料进行了简要分析,通过对蜗壳的钢板应力、钢筋应力、应变等监测资料在蜗壳运行期间充、放水的变化,结合数理统计模型与应力分布图,简述了三峡蜗壳钢板及外包混凝土的不同工况下的变化规律,为工程运行和保温保压进行二期混凝土浇筑工艺的效果提供了参考依据。 A brief analysis of monitoring data under low water-head operation designed for Three Gorges hydropower station on left bank house while the pressure and temperature of filled water was kept for spiral case after second phase outsourcing concrete casting is given in the paper.Through contrasting the monitoring data change of stress of volute steel plate and steel bar,strain,etc.during water filling,drainage operation of volute,combined with mathematical statistical model and stress distribution diagram,The change law of Three Gorges volute steel plate and outsourcing concrete during different conditions is described in the paper.So it provides a useful reference for keeping pressure and temperature operations and the two phase concrete casting process of volute.
作者 丁长青
出处 《水电自动化与大坝监测》 2011年第2期67-71,77,共6页 HYDROPOWER AUTOMATION AND DAM MONITORING
关键词 水电站 水轮机 蜗壳 保温保压 统计模型 应力分析 hydropower plants turbines spiral cases keep the pressure and temperature statistical models stress analysis
  • 相关文献

参考文献2

同被引文献62

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部