摘要 The Three Gorges Project of the Yangtze River is the largest hydropower-complex project under construction in the world. Under the largescale relocation projects, 2874 engineered slopes are formed along with the construction of new towns. In this paper, the cutting slopes are mainly soil slopes and rock slopes. Soil slopes include residual soil slopes, colluvial accumulation slopes, swelling soil slopes, and artificial earth fill slopes, etc. Rock slopes include blocky structure rock slopes, layer structure rock slopes, and clastic structure rock slopes, etc. Varied protection measures have been used for slope protection in the reservoir area including shotcrete concrete-anchor bars, frame beams, retaining walls, slope stabilizing piles, sheet-pile walls, anchorage anti-shear tunnels, flexible protection grids, and drainage, etc. Besides, slope deformation monitoring systems have been set up to monitor deformation failure and the stability state of slopes. The protection measures have guaranteed slope safety and maintained a harmony with the urban environment and surrounding landscape.
出处 《Journal of Mountain Science》 SCIE CSCD 2011年第2期314-320,共7页 山地科学学报(英文)
基金 supported by the Project of Scientific Research of High Cutting Slope Protection of the Third Stage Geological Hazards in Three Gorges Reservoir Area (Grant No.2008SXG01-5) State Council Three Gorges Project Construction Committee Executive Office supported under the grant of TGRC201025 from the Three Gorges Research Center for geo-hazard, Ministry of Education, China
关键词 Slope reinforcement Housing for resettlement Three Gorges Reservoir 三峡库区 边坡加固 岩石层结构 房屋 保护措施 变形监测系统 三峡工程 斜坡稳定性
  • 相关文献

参考文献4

二级参考文献27

  • 1HEYurong LIAOChaolin XUPei ZHANGBaohua.Zonal Distribution of the Erosion-Landslide and Soil Micromorphological Features in Purple Hilly Region[J].Journal of Mountain Science,2005,2(1):42-49. 被引量:6
  • 2吴子树,张利民,胡定.土拱的形成机理及存在条件的探讨[J].成都科技大学学报,1995(2):15-19. 被引量:94
  • 3铁道部第一勘测设计院.铁路工程设计技术手册--路基[M].北京:中国铁道出版社,1995.8-12.
  • 4Kishi N, Ikeda K, Konno H, Kawase R (2000) Prototype impact test on rockfall retaining walls and its numerical simulation. Proceedings of Structures under Shock and Impact IV, Cambridge, England: 351-360.
  • 5Salciarini D, Tamagnini C, Conversini P (2009) Discrete element modeling of debris- avalanche impact on earthfill barriers, Physics and Chemistry of the Earth. Doi: 10.1016/j.pce.2009.05.002.
  • 6Cundall, P.A., 1971. A computer model for simulating progressive large scale movement in blocky rock systems. Proceedings of the Symposium of the International society of rock mechanics, vol. 1. Nancy, France. Pp. II-8.
  • 7Cundall, P.A., Strack, P.D.L., 1979. A discrete numerical model for granular assemblies. Geoteehnique 29, 47-65.
  • 8Tang C.L., Hu J.C., Lin M.L., Angelier J., Lu C.Y., Chan Y.C., Chu H.T., 2009. The Tsaoling landslide triggered by the Chi-Chi earthquake, Taiwan-Insights from a discrete element simulation. Engineering Geology 106: 1-19.
  • 9Itasea, Consulting Group Inc., 2002. PFC2D Particle Flow Code in 2 Dimensions. User's Guide. Minneapolis.
  • 10Potyondy, D.O., Cundall, P.A., 2004. A bonded-particle model for rock. International Journal of Rock Mechanics and Mining Sciences 41: 1239-1364.

共引文献261

同被引文献52

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部