摘要
介绍预制管桩施工后上浮的原因,探讨预制管桩上浮处理方案及施工方法,以解决预制管桩上浮后承载力不足等问题。
The floating reasons of precast tubular pile have been introduced and the floating treatments and construction methods are also discussed,so that the deficiency of bearing capacity due as floating of precast tubular pile can be solved.
出处
《土工基础》
2010年第6期8-10,共3页
Soil Engineering and Foundation
关键词
预制管桩
上浮
注浆混凝土
承载力
precast tubular pile
floating
grouted concrete
bearing capacity