摘要 设计了旅大27-2、32-2油田群开发工程项目主电站并车调试方案,首次在海上平台不断电、不停产情况下完成了天然气发电机组与原油发电机组的并车调试试验,探索出发电机组海上不断电并车调试试验的新思路,也使得海上平台电站主机选择低成本的天然气机组成为可能。 The generator set paralleling scheme was designed for main power station in LD 27-2/32-2 oilfield group development project and it is the first time in China to parallel natural gas generator set and crude oil generator set without power and production shutdown on offshore platform.This has brought us a new idea for paralleling generator sets without power shutdown,so that we can choose the low cost natural gas generator sets for main power station on platform.
出处 《中国海上油气》 CAS 北大核心 2011年第1期62-65,共4页 China Offshore Oil and Gas
关键词 海洋石油平台 发电机组 不断电 并车调试试验 offshore oil platform generator set without power shutdown paralleling
  • 相关文献

参考文献1

  • 1中国船级社.钢制海船入级与建造规范:4.1.7交流发电机[S].北京:人民交通出版社,2009.

同被引文献6

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部