摘要 针对三峡电厂21F机组运行时的噪声和振动问题,分别测量和分析了机组的噪声、振动及水压脉动情况。结果表明,涡壳进入门处86.5Hz的噪声来源于导叶相对开度为70%~77%时的流体绕流,与机组振动无关。水车室53.55、35.70、17.85Hz的噪声主要来源于旋转的转轮与水流的相互作用及各叶片通道流体的不均匀。 Aiming at the problem of noise and vibration in unit 2iF of Three Gorges power plant, the noise, vibration and water pressure pulsation are measured and analyzed. The results show that the noise frequency 86.5 Hz of the spiral case inlet is caused by the flow around with relative opening of guide vane during 70%-77% while it is not associated with the unit vibration; the noise frequency 53.55 Hz, 35.70 Hz and 17.85 Hz of the waterwheel room are mainly a- roused by the interaction between runner and water flow and the non-uniform flow among turbine blades.
出处 《水电能源科学》 北大核心 2011年第5期117-119,共3页 Water Resources and Power
关键词 水电机组 高负荷运行 故障诊断 噪声测量 水压脉动 三峡电厂 hydroelectric generator sets high load operation fault diagnosis noise measurement water pressure pulsation Three Gorges power plant
  • 相关文献

参考文献5

  • 1Richard K, Fisher J R. A Case Study in Resonant Hydroelastic Vibration: The Causes of Runner Cracks and the Solutions Implemented for the Xiaolangdi Hydroelectric Project [A]. Proceedings of the XXIst IAHR Symposium on Hydraulic Machinery and Systems[C]. Lausanne, 2002.
  • 2李启章.三峡机组振动稳定性问题应以预防为主[J].水利水电技术,1999,30(11):15-17. 被引量:11
  • 3张良颖,孙建平.三峡电厂左岸^#6机组性能分析[J].水电能源科学,2009,27(3):137-140. 被引量:2
  • 4王佐民.噪声与振动测量[M].北京:科学出版社,2008.
  • 5中国水利水电科学研究院,哈尔滨大电机研究所.水力机械振动和脉动现场测试规程(GB/T17189-1997)[S].北京:中国标准出版社,1997.